Cleanroom Factor of Cost
01 June 2016

Cleanroom Factor of Cost

Domestic and international regulations, customer demand, competition, and the imperatives of quality assurance are all pressures that are pushing medical device manufacturers to adopt higher standards in their cleanroom manufacturing practices. At the same time, these manufacturers are feeling countervailing pressures from the public, medical practitioners, hospitals, insurance companies, and competitors to contain costs.

Factor of cost

• Precise humidity control
• Strictly particle requirement
• High air quality
• Energy saving equipment
• Non line down production
• High security system
• Special construction material
• High stability equipment
• High cleanliness, non-pollution material and system
• Tight project management

Solution-Energy Saving

  • Building Energy Saving
    • Wall
    • Door & window
    • Roof top
    • Solar energy
    • Night ventilation
  • Cleanroom Energy Saving
    • Few way of energy saving for cleanroom during winter:
    • Cooling tower recycling system
    • Variable flow system on chilled water pump
    • Exhaust heat recovery system
    • Using VSD water pump & exhaust fan
  • Cleanliness principal
    • Do Not Bring
      • Not transmitted inappropriate air pressure
      • Good airtight construction
      • Dust removal before entering
    • Awareness
      • Less people & light action
      • Dress clean room gown
      • Use specialize CR tools
    • Don’t Accumulate Work Load
      • Keep wall smooth and no dead end
      • Matainance and cleaning on time
      • Keep space around equipment
      • High speed exhaust
      • Direct exhaust of pollution
      • Adequate air changes
      • Appropriate air flow velocity